Overview

- Mustang and Morningstar located in Walker Lane
- Walker Lane has produced 8 million (plus) ounces gold and 230 million (plus) ounces of silver from 7 major mining camps
- Epithermal gold and silver deposits hosted in Tertiary volcanic and Mesozoic sedimentary rocks
- 72 claims with 100% rights held by Teslin
-
Claims in close proximity to previous production
- 12.5 km southwest of Paradise Peak Mine
- 1.5M+ oz Au & 40M oz Ag
- 3.2 km from Pactolus and Warrior mines
- Geology & Geochemistry similar to Paradise Peak
- 8 holes drilled in Spring 2011
-
Successful drilling in Spring 2011 resulted in:
- 7.6m of 2.56g/t Au within 12m of 1.71g/t Au in M11-06
- 4.6 m of 1.6g/t Au within 9m of 0.87g/t Au in M11-05
- 8 hole (1,500m) reverse circulation drilling program ($200,000) in planning from Spring 2011 results
Regional Gold Deposits
Paradise Peak Mine
- 1.5M oz Au & 30M oz Ag
- High grade Au mineralization
- 20,000 oz Au
- High Grade Au mineralization
- 10,000 oz Au
- 700k oz Au & 5M oz Ag
- John Kerr discovery
- 400k oz Au
- 40,000 oz Au & 2M oz Ag
- John Kerr discovery
- 1M oz Au
Mineralization
- Major northwest trending belt of strike slip faulting near the western edge of the Basin and Range Province.
- Extensive volcanic and sedimentary rocks ranging from Permian to Miocene age
- Outcroppings of fresh to intensely altered Tertiary volcanic rocks occur in the northern part of Mustang
- Southern part of property covered by extensive but thin Quaternary (recent) surficial deposits.
2011 Drilling Highlights
| M11-05 | |
|---|---|
| Depth (ft) | Au g/t |
| 335-340 | 0.24 |
| 340-345 | 0.73 |
| 345-350 | 3.16 |
| 350-355 | 0.81 |
| 355-360 | 0.11 |
| 360-365 | 0.15 |
| M11-06 | |
|---|---|
| Depth (ft) | Au g/t |
| 180-185 | 2.48 |
| 185-190 | 3.30 |
| 190-195 | 2.29 |
| 195-200 | 3.02 |
| 200-205 | 1.71 |
| 205-210 | 0.47 |
| 210-215 | 0.23 |
| 215-220 | 0.19 |
Planned Drilling for Q4 2011
- Open to west, south and northwest
- Planning 8 holes to 400-500 ft depth
- Will test westerly and southerly projections
- Holes are planned at 300ft intervals
John R. Kerr P. Eng. is a Qualified Person pursuant to NI 43-101 and has reviewed and approved the technical contents above.








